Showing all 7 results

Sort by

15m Cable Percussion Borehole

£1,500.00

Additional 15m deep borehole with in-situ testing (SPTs) sampling (UT100) and testing (undrained triaxials) focused on obtaining design parameters for piled foundations.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

Additional Borehole

£300.00

Single additional window sampler borehole, with testing and reporting (e.g. for a detached garage, outbuilding or extension, etc.) up to 46m2 (500sq.ft).

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

BRE365 Soakage Test

£1,040.00

One test pit, up to 3 repeat tests, up to 2 days. 1no machine excavated trial pit max 1.50m long, 2.00m deep and 0.45m wide. Up to 3 repeat tests up to 2 days duration total.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

Foundation Exposures

£150.00

1no hand excavated trial pit to expose existing footings, for instance where excavation is required below or adjacent to an existing building or boundary wall, etc. Excavation 1.50m deep, 0.50m wide and up to 1.00m away from the wall.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

Full Phase 1 Desk Study

£495.00

A full phase 1 environmental report including Conceptual Site Model (CSM), Preliminary Risk Assessment (PRA) and recommendations for any intrusive investigation required. Includes a full Envirocheck datasheet and historical map pack, a walkover survey and a review of aerial imagery.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

In-Situ CBR Testing

£60.00

Carry out 3no CBR tests using a TRL DCP adjacent to existing borehole locations.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.

Water Monitoring

£300.00

Recommended for all projects with deeper excavations (e.g. all sites with a basement, swimming pool) cut into a slope (e.g. to create a level area), or where there are there issues with shallow groundwater (e.g. on flat low-lying ground near rivers, etc.). One 5m deep monitoring well and one return monitoring visit.

Please note all prices exclude VAT and all contracts are subject to our standard Terms and Conditions.